forecast option of estimation command
Posted: Fri May 14, 2010 3:07 pm
Hi,
I use the latest version 4.1.1 to perform a Bayesian estimation. In the User Guide (page 55) and User Manual (page 40), it is mentioned that there is a forecast option in the estimation command. The forecasts will contain two confidence intervals, one is due to parameter uncertainty (HPDinf, HPDsup) and the other is due to parameter uncertainty and future shocks (HPDTotalinf, HPDTotalsup).
But when I run the following simple code, the ouput forecasting field only produces the first set of interval, HPDinf and HPDsup. There is no second interval, HPDTotalinf and HPDTotalsup. Please advise how to get the second interval.
Thanks,
Eric
I use the latest version 4.1.1 to perform a Bayesian estimation. In the User Guide (page 55) and User Manual (page 40), it is mentioned that there is a forecast option in the estimation command. The forecasts will contain two confidence intervals, one is due to parameter uncertainty (HPDinf, HPDsup) and the other is due to parameter uncertainty and future shocks (HPDTotalinf, HPDTotalsup).
But when I run the following simple code, the ouput forecasting field only produces the first set of interval, HPDinf and HPDsup. There is no second interval, HPDTotalinf and HPDTotalsup. Please advise how to get the second interval.
Thanks,
Eric