Calibrating/Estimating DSGE models for two time periods
Posted: Fri Feb 20, 2015 2:47 am
Hello,
I was wondering if there is material on estimating DSGE models, whether it is RBC or New Keynesian for the before and after 1980 periods.
There were some papers that discussed results when the model was split up before time and how it fared in compared to data split in the same periods.
I have tried it before, but I wanted to read more into it.
Thanks.
I was wondering if there is material on estimating DSGE models, whether it is RBC or New Keynesian for the before and after 1980 periods.
There were some papers that discussed results when the model was split up before time and how it fared in compared to data split in the same periods.
I have tried it before, but I wanted to read more into it.
Thanks.