Hi
Is it possible to make an unanticipated shock in a simulation of a deterministic model in for instance period 2? I.e. that the economy is hit by an unanticipated shock at time t=2 but such that the path for the shock is completely known afterward? I'm not sure whether this break with the "determinism"
THx