Hi all,
Wondering if someone can help me with my dynare code. I have designed a small open economy version of Iacoviello (2005). Attached is a picture of the 25 equations that consist of the model. Also attached is my dynare code. Matlab 2015b constantly says that my preprocessing has failed. I have 25 endogenous variables and 25 equations, why is this still coming up?
Thank you
MSCstudent