by sidus87 » Fri Jul 20, 2012 7:10 pm
I estimated my model using mode_compute=6 (which takes around 45 minutes). Since the acceptance rate during the Metropolis-Hastings is too low, i need to lower the scale parameter. The question is: is there a way to go directly to the M-H using the values previously estimated?